Even a high-quality product underperforms without correct installation. Wall clearance, brackets and leak-tight connections directly affect heat distribution.
Before installation, clean the pipework and check system water quality. Residues can cause flow losses in valves and the radiator body. Connection orientations and accessory compatibility are listed in Alurator technical documents.
Venting must not be skipped during commissioning. Trapped air creates uneven heating. Check for leaks on first start-up and monitor balance under low load.
In building-wide central systems, pressure and balancing valves should follow the project engineer’s guidance. After installation, share simple maintenance tips with the user (periodic venting, surface cleaning).



